Comparative Analysis Of Implementation Plan Costs Between Daily Wages And Contract Wages In Building Construction Projects (Case Study Of Jakarta Islamic Hospital Pondok Kopi)
DOI:
https://doi.org/10.51988/jtsc.v7i3.532Keywords:
Comparative, Contract RAB, Wages RABAbstract
In this study, researchers reworked the RAB (Budget Plan) that was not previously obtained from the research site. The expected outcome of processing the RAB data is to identify which jobs have the greatest weight and require piecework wages. This is then compared to the RAP. Because of this simple point, errors still occur frequently in some projects, resulting in budget overruns. This daily and piecework wage system often occurs in projects. Therefore, the author wants to conduct an analysis of the comparative cost of the Jakarta Islamic Hospital Development Project Pondok Kopi, between the work analysis according to the Cost Budget Plan based on the results of the survey based on daily wages and the Cost Budget Plan based on the results of the survey based on piecework wages based on the Cost Budget Plan. Differences in wage systems significantly impact project cost efficiency. Daily wages tend to provide workers with income security, but they risk reducing productivity if there is no close supervision. Conversely, piecework wages can increase productivity due to the incentive to complete work more quickly, but they can potentially reduce quality if supervision is suboptimal. This research is relevant to the Jakarta Pondok Kopi project, where challenges such as tropical weather and material availability require an adaptive wage approach.
References
I. Arbana and Ir. I. J. Pandia, “ANALISA RENCANA ANGGARAN BIAYA TERHADAP PELAKSANAAN PEKERJAAN PERUMAHAN DENGAN MELAKUKAN PERBANDINGAN PERHITUNGAN HARGA SATUAN BAHAN BERDASARKAN SURVEY LAPANGAN”.
I. Gst. K. Sudipta, “STUDI MANAJEMEN PROYEK TERHADAP SUMBER DAYA PADA PELAKSANAAN PROYEK KONSTRUKSI,” vol. 17, no. 1, pp. 73–83, 2013.
N. P. M. N. MAS, “ANALISIS PERBANDINGAN UPAH TENAGA KERJA HARIAN DENGAN BORONGAN BERDASARKAN RENCANA ANGGARAN BIAYA (RAB) PADA PROYEK PEMBANGUNAN UNIT SEKOLAH BARU SMAN 12 DENPASAR,” 2024.
T. D. Laksono, “Produktivitas pada proyek konstruksi,” pp. 11–18.
Rivan, “PROPOSAL SKRIPSI EFEKTIVITAS MODEL PEMBELAJARAN DOMINAN ONLINE TERHADAP HASIL BELAJAR SISWA SEJARAH DI SMA TERBUKA GAMBUT,” pp. 1–19, 2021.
M. A. Surachman and P. E. Agustyawan, “Analisa produktivitas tenaga kerja harian dan borongan pada proyek rsud dr. soegiri lamongan,” vol. 4, no. 1, pp. 0–7.
D. Lontaan, Adolfina, and L. O. H. Dotulong, “PRODUKTIVITAS PEKERJA UPAH HARIAN DAN UPAH BORONGAN ( Studi Pada Pekerja Usaha Meubel Di Desa Leilem ) COMPARATIVE ANALISYS OF EMPLOYEE LOYALTY AND PRODUCTIVITY OF DAILY WAGES PIECE RATE ( Study of Furniture Employees in Leilem Village ) Jurnal EMBA Vol .,” vol. 7, no. 4, pp. 5623–5632, 2019.
E. Handayani, M. Nuklirullah, and A. Riyadi, “Analisa Koefisien Harga Satuan Tenaga Kerja di Lapangan Dengan Analisa SNI Struktur Bangunan Gedung di Kota Jambi,” vol. 4, no. 1, pp. 23–29, 2021, doi: 10.33087/talentasipil.v4i1.45.
JDIH Kementerian PUPR, “PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA NOMOR 28/PRT/M/2016 TENTANG PEDOMAN ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM,” 2016.
K. A. Ratag, G. Y. Malingkas, and J. Tjakra, “Perbandingan Rencana Anggaran Biaya Antara Metode SNI Dengan Metode AHSP Pada Proyek Gedung Pendidikan Fakultas Teknik Jurusan Teknik Sipil Universitas Sam Ratulangi,” vol. 19, pp. 299–305, 2021.
G. R. S. KUDDI, R. Arifuddin, and S. Mustari, “STUDI PERBANDINGAN BIAYA PADA PROYEK PEMBANGUNAN RUMAH KHUSUS BAGI MASYARAKAT BERPENGHASILAN RENDAH (MBR) DAN TNI DI KAB. DOGIYAI PROV. PAPUA”.
S. Ardhy, “Analisis Perbandingan Biaya Rencana Anggaran Pelaksana Antara Upah Harian dan Upah Borongan dengan Rencana Anggaran Biaya,” 2018.
Muhammad Imam Subekti, Totok Yulianto, Titin Sundari, and Meriana Wahyu Nugroho, “Analisis Komparatif Penerapan Metode Pengupahan Harian Dan Borongan Pada Proyek Renovasi Gedung Sekolah Dasar,” Media Konstruksi, vol. 9, no. 3, pp. 269–274, 2024, doi: 10.33772/medkons.v9i3.66.
L. Lisman, S. Sufrianto, H. Hakiman, and V. A. Ilham, “Analisis Perbandingan Upah Harian dengan Borongan (Studi Kasus Proyek Peningkatan Kualitas Permukiman Kumuh Desa Lagasa),” Sultra Civil Engineering Journal, vol. 4, no. 2, pp. 140–148, 2023, doi: 10.54297/sciej.v4i2.528.
A. Maskur, “Analisis Perbandingan Biaya Rencana Pelaksanaan Antara Upah Harian Dan Borongan Terhadap Rencana Anggaran Biaya,” Jurnal Media Teknologi, vol. 9, no. 2, pp. 116–132, 2023, doi: 10.25157/jmt.v9i2.2947.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.