Analysis Of The Application Of Time Management In Building Projects With Critical Path Method (Cpm) And Earned Value Method (Evm) (Case Study: Jakarta Islamic Hospital Pondok Kopi)
DOI:
https://doi.org/10.51988/jtsc.v7i3.533Keywords:
Time Management, CPM, EVM, Schedule Performance Index (SPI), Schedule Variance (SV)Abstract
This study analyzes the implementation of time management in construction projects using the Critical Path Method (CPM) and Earned Value Method (EVM) methods in the construction project of the Jakarta Islamic Hospital Pondok Kopi. This research is motivated by the importance of time control in project implementation to minimize delays. The methods used include work network analysis using CPM to determine the critical path and duration of the project, as well as time performance analysis using EVM through the parameters of Planned Value (PV), Earned Value (EV), Schedule Variance (SV), and Schedule Performance Index (SPI). The results of the CPM analysis show that the duration of the project completion is 274 days, faster than the duration of the plan on the S curve which is 287 days. However, the results of the EVM analysis show that the project time performance is delayed, which is shown by the Schedule Performance Index (SPI) value of 0.77061 and the Schedule Variance (SV) value of negative. This indicates that the actual progress of the project is lower compared to the plan that has been set. Thus, although the project has the potential to be completed faster in terms of planning based on CPM analysis, the actual conditions on the ground indicate that the project is delayed. Therefore, more optimal control is needed, especially on critical path activities, to improve project time performance.
References
Banteng, B. S. D., & Uno, W. R. (2021). Application of time management systems in tardiness of the auditorium construction projects in the district Bone Bolango, Gorontalo Province. IOP Conference Series: Materials Science and Engineering, 1098(2), 022028. https://doi.org/10.1088/1757-899x/1098/2/022028
Bodunwa, O., & Olalekan, J. (2020). Application of Critical Path Method (CPM) and Project Evaluation Review Techniques (PERT) in Project Planning and Scheduling. Journal of Mathematics and Statistical Science, 6, 1–8.
Cao, P., Li, D., Cao, Z., Huang, D., & Wang, J. (2025). Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method. Buildings, 15(8). https://doi.org/10.3390/buildings15081285
Dewi, Sari Utama. 2023. “Analisis Manajemen Waktu Dan Biaya Pada Proyek Pembangunan Gedung Menggunakan Konsep Metode Nilai Hasil.” Jice (Journal Of Infrastructural In Civil Engineering) 4(01): 34. Doi:10.33365/Jice.V4i01.2571.
Dina Amalia Ahmad. 2024. “Pengaruh Manajemen Material Terhadap Kubah Emas Makassar Disusun Dan Diajukan Oleh?:” : 1–6.
Hidayat, Ahmad, And Cahya Ramadhany. 2021. “Analisa Penerapan Manajemen Waktu Pada Proyek Pembangunan Jembatan Gantung Lubuk Ulak Dengan Metode Cpm.” Bearing?: Jurnal Penelitian Dan Kajian Teknik Sipil 07(02): 71–79.
Ibrahim, A. T., Sirajo, A., & Ibrahim, A. H. (2022). The Effects of Delay and Time Management Building Construction: A Review. International Journal Of Scientific Advances, 3(4), 628–632. https://doi.org/10.51542/ijscia.v3i4.29
Jie, D., & Wei, J. (2022). Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management. Buildings, 12(12). https://doi.org/10.3390/buildings12122173
Metode, Penggunaan, C P M Critical, Path Method, Proyek Pelebar, And A N J Alan Batas. 2012. “Pada Pelaksanaan Dan Pengawasan Kota Medan- Lubljk Pakam Universitas Medan Area Fakultas Teknik Universitas Medan Area Me Dan Proyek Pelebaran Jalan Bat As Kotamedan -Lubukpakam.”
Priyo, M. (2021). Earned Value Management System in Indonesian Construction Projects. International Journal of Integrated Engineering, 13(3), 37–45. https://doi.org/10.30880/ijie.2021.13.03.005
Revistar, Perkantoran, Lantai Graha, And Dewata Malang. 2016. “Analisis Penerapan Manajemen Waktu Ada Proyek Bangunan Perkantoran Revistar 3 Lantai Graha Dewata Malang Maria Yoventa Rhebi)., Dr.Nawir Rasidi,St.,Mt*.,Suhudi.,St.,Mt**) Ps. Teknik Sipil, Fakultas Teknik, Universitas Tribhuwana Tunggadewi.”
Saputro, Dimas, And Sa’ban Riyanto. 2021. “Analisa Manajemen Risiko Pada Pelaksanaan Pembangunan Proyek Konstruksi Khususnya Bangunan Bertingkat Tinggi Di Kota Semarang.” : 16.
Shehu, S. (2021). a Review of Time Management Factors in Construction Project Delivery. Journal of Project Management Practice, 1(2), 34–45. https://doi.org/10.22452/jpmp.vol1no2.3
Sidiq, Andy Permana, And Ganjar Jojon Johari. 2022. “Analisis Penerapan Earned Value Terhadap Manajemen Waktu Dan Biaya Pada Proyek Jembatan Cibuni.” Jurnal Konstruksi 20(1): 139–50. Doi:10.33364/Konstruksi/V.20-1.1036.
Sonarghare, H., Shah, D., Solanki, J., & Viramgama, S. (2026). Earned Value Management as a Strategic Tool for Cost, Schedule, and Resource Optimization in Construction Projects. International Journal of Science, Strategic Management and Technology, 02(05), 1–9. https://doi.org/10.55041/ijsmt.v2i5.087
Sufa?Atin. 2017. “Penerapan Metode Earned Value Management (Evm) Dalam Pengendalian Biaya Proyek.” Prosiding Snatif Ke -4: 311–21.
Suhartono, Budi, Budi Budi, Amiruddin Siahaan, Inom Nasution, And Makmur Syukri. 2022. “Analisis Metode Dan Pendekatan Dalam Manajemen Proyek Pada Dunia Pendidikan.” Edumaspul: Jurnal Pendidikan 6(1): 25–31. Doi:10.33487/Edumaspul.V6i1.2809.
Surya Wibowo, Ade. 2020. “Analisis Pengendalian Proyek Dengan Menggunakan Metode Cpm Dan Evm Pada Proyek Pembangunan Gedung (Studi Kasus Pembangunan Gedung Di Tangerang Oleh Pt.X).”
Tolu Tamalika, And Indra Syahrul Fuad. 2022. “Analisis Penjadwalan Waktu Pekerjaan Proyek Poltekkes Jurusan Farmasi Tahap I Dalam Perspektif Manajemen Proyek.” Jurnal Pendidikan Tambusai 6(1): 8207–14. Https://Jptam.Org/Index.Php/Jptam/Article/View/3685.
Ummah, Masfi Sya’fiatul. 2019. “Manajemen Proyek Sistem Informasi Teknosian.” Sustainability (Switzerland) 11(1): 1–14. Http://Scioteca.Caf.Com/Bitstream/Handle/123456789/1091/Red2017-Eng-8ene.Pdf?Sequence=12&Isallowed=Y%0ahttp://Dx.Doi.Org/10.1016/J.Regsciurbeco.2008.06.005%0ahttps://Www.Researchgate.Net/Publication/305320484_Sistem_Pembetungan_Terpusat_Strategi_Melestari.
Yuwono, Wiji, M. Elfan Kaukab, And Yusqi Mahfud. 2021. “Kajian Metode Pert-Cpm Dan Pemanfaatannya Dalam Manajemen Waktu Dan Biaya Pelaksanaan Proyek.” Journal Of Economic, Management, Accounting And Technology 4(2): 192–214. Doi:10.32500/Jematech.V4i2.1925.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.