PENGENDALIAN WAKTU PELAKSANAAN PROJECT DENGAN MENGGUNAKAN EARNED VALUE CONCEPT
DOI:
https://doi.org/10.51988/jtsc.v4i1.125Keywords:
Earn Value, pengendalian waktu, BCWS, BCWPAbstract
The success of a project is a series of activities that include the stages of planning, implementation and supervision, so that the goals that have been set can be achieved and implemented. Therefore, it is necessary to carry out supervision and control measures in various sectors, especially time control. The method used in this study is the Earn Value Concept method. This research was conducted, with the aim of knowing the performance of the project, problems occurring and solutions to these problems. The data used are in the form of an S curve, RAB, and weekly progress reports. From these data obtained the results of BCWS and BCWP, with the help of Microsoft Excel programs set SV, SPI values, as well as predicting the final time of the project (ETC and EAC).
References
Noegroho, 2014, Peningkatan Kualitas Pembuatan Keputusan dan Pengendalian Kemajuan Pelaksanaan Proyek Menggunakan Analisis Earned Value.
Soeharto, Iman. 1995. Manajemen Proyek Dari Konseptual Sampai Operasional.
Jakarta.
Ayuhalinda, 2018, Evaluasi Pengendalian Waktu Pada Proyek Pembangunan Gedung Rawat Inap 3 Dan 4 Rsud Suradadi Menggunakan Earned Value Concept.
Soemardi B.W, dkk., 2007 Konsep Earned Value untuk Pengelolaan Proyek Konstruksi.
Dr. Hafnidar A. Rani S.T., M.M., 2016, Manajemen Proyek Kontruksi, Yogyakarta, Penerbit Deepublish.
Rina Rahmawati, 2020, Konsep Earn Value Analysis Terhadap Waktu Pada Proyek Pembangunan Kolam Retensi Desa Sirnaraga.
Janizar, S., Habdullah, H., Setiawan, F., & Schipper, L. A. (2022). PERENCANAAN JEMBATAN CABLE STAYED 200 METER (Studi Kasus: Jembatan Cijambe Garut). JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 3(1), 43-59.
Rahmanto, T., & Janizar, S. (2022). PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PROYEK FAMILIA URBAN BEKASI. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 3(2), 16-27.
Setiawan, Felix & Syapril Janizar, 2021. Percepatan Jadwal Konstruksi Dan pengaruhnya Terhadap Biaya Penyelesaian Proyek Konstruksi. Jurnal Teknik Sipil Cendekia, Vol 2 No 1.
Alfian, 2016. Evaluasi Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Jalan Strategis Matang Sijuek-Trieng Pantang Dengan Menggunakan Metode Earned Value.
Agnese Therese Lagonda, Pingkan A.K Pratasis, Jermias Tjakra, 2021. Analisis Penerapan Manajemen Waktu Pada Proyek Konstruksi. (Studi Kasus: Office and Distribution Center, Airmadidi, Minahasa Utara).
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.