LIFE CYCLE COST ANALYSIS OF HOUSEHOLD DESIGN WIRASAKTI HOSPITAL, KUPANG CITY
Keywords:
life cycle cost, alternatif desain, tanggaAbstract
Kupang City has development potential because it is still classified as a developing city. In general, the Wirasakti Hospital building construction project in the city of Kupang has implemented the project management concept well, but there are still a number of things that need to be considered in order to use costs efficiently and effectively. The building elements that are reviewed and analyzed are the stair elements in the building project by considering several aspects, namely the cost aspect, the comfort aspect and the aesthetic aspect.
This research presents an algorithm for choosing the best alternative field among various stair design structures (staircase types) using Life Cycle Cost. Economic efficiency (removing and replacing secondary functions), landscaping, construction capabilities, function of building elements (replacing systems) are considered in the planning of stair elements. Replacing the system, eliminating and replacing secondary functions are evaluated for each plan for each alternative plan with optimal design taking into account the life cycle cost (LCC).
The results of the Life Cycle Cost analysis are obtained as alternative stairs which are selected using stair beam materials with calcide/calcistair, stair plates with hollow iron and glass railings & stainless steel pipes.
References
Rahmanto, T., & Janizar, S. (2022). Pengendalian Biaya dan Waktu dengan Metode Earned Value Proyek Familia Urban Bekasi. Jurnal Teknik Sipil Cendekia (JTSC), 3(2), 331-342.
Setiawan, F., & Janizar, S. (2021). Percepatan Jadwal Konstruksi dan Pengaruhnya Terhadap Biaya Penyelesaian Proyek Konstruksi. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 2(1), 90-126.
Nabut, Y. V., Henong, S. B., & Pattiraja, A. H. (2021). ANALISA FAKTOR-FAKTOR YANG PALING DOMINAN PENYEBAB KETERLAMBATAN PROYEK. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 2(2), 182-190.
Janizar, S., & Abdullah, F. H. (2023). EFISIENSI WAKTU DAN BIAYA DALAM PENGGUNAAN ALAT BERAT PADA PEKERJAAN PEMELIHARAAN OVERLAY RUAS TOL CIPULARANG JALUR A. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 4(1), 450-463.
Setiawan, F., & Ihsan, M. (2023). PENGENDALIAN WAKTU PELAKSANAAN PROJECT DENGAN MENGGUNAKAN EARNED VALUE CONCEPT. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 4(1), 472-518.
Atabay, S dan Galipogullari, N. (2012). “Aplication of Value Engineering in Construction Projects”, 10th International Congress on Advances in Civil Engineering, 17-19 October 2012 Middle East Technical University, Ankara, Turkey, hal. 78-87
Ayodeji, E.O dan Ogunsemi, D, R. (2012). “Training of Nigerian Quantity Surveyors for Value Manageent Practice”, International Journal fo Construction Management, No 2, Vol 4, hal. 148-156
Der Leu, J. dan Lee, L.J.H. (2016).”Enterprise Resource Planning (ERP) Implementation Using the Value Engineering Methodology and Six Sigma Tools”, Journal homepage: http://www.tandfonline.com/loi/teis20
Haghnegahdar, L dan Asgharizadeh, E. (2008).”The Risk and Value Engineering Structures and their Integration with Industrial Projects Management (A Case Study on I. K. Corporation)”, World Academy of Science Engineering and Technology, No 16, hal.375-383
Kissi Ernest, E.,Boateng, B.,Kummi, A. dan Badu, E. (2016).”Principal Component Analysis of Challenges Facing the Implementation of Value Engineering in Public Projects in Developing Countries”, International Journal of Construction Management
Palmer, A., Kelly, J. dan Malle, S. (1996).”Holistic Appraisal of Value Engineering in Construction in United States”, Journal Construction Engineering Management, hal.324-328
Pedoman Pelaksanaan Teknis Rekayasa Nilai. (2022). “Kementrian Pekerjaan Umum da Perumahan Rakyat”. Direktorat Jendral Bina Marga.
Rad, K.M dan Yamini, O.A. (2016). “The Methodology of Using Value Engineering in Construction Project Management”, Civil Engineering Journal, No. 6, Vol. 2, hal. 262-269
Rani, Hafnidar. “Manajemen Proyek Konstruksi”. (2017). Sleman : Budi Utama
Tohidi, H. (2011).”Review the Benefits of Using Value Engineering in Information Technology Project Management”, Procedia Computer Science, 3, hal. 917-924
Published
Issue
Section
License
Copyright (c) 2023 Gregorius Paus Usboko, Merzy Mooy, Sri Santi M L F Seran

This work is licensed under a Creative Commons Attribution 4.0 International License.