ANALISIS PRODUKTIVITAS ALAT BERAT DAN SITE LAYOUT DALAM PEKERJAAN STRUKTUR BAWAH (STUDI KASUS: PROYEK PEMBANGUNAN YOGYA KOTA BARU PARAHYANGAN)

Authors

  • Dila Rivana Universitas Komputer Indonesia
  • Yongki Alexander Tanne Universitas Komputer Indonesia
  • Shyva Farhani Universitas Komputer Indonesia

DOI:

https://doi.org/10.51988/jtsc.v5i1.159

Keywords:

Productivity, Heavy Equipment, Site Layout, Foundation, Pile Cap, Column

Abstract

Construction equipment, especially heavy equipment, has an important role in the implementation of construction projects. The YOGYA Kota Baru Parahyangan Development Project is a building construction project that requires heavy equipment, so management of time efficiency and cost of using heavy equipment is important. This research aims to improve labor efficiency and speed up the completion of work. Quantitative research methods were used in this study to calculate and evaluate heavy equipment productivity Site Layout project. The calculation results for the productivity of the heavy equipment for the pile driver (HSPD) are 0.234 m/minute, the excavator is 26,67 m3/hour, and the tower crane is 11.1 kg/minute. Evaluation Site Layout the project identifies zoning, placement, accessibility, safety and resources related to the project, and provides criticism and suggestions to improve work efficiency and worker safety. Assuggestion the development of further research, it is possible to carry out a more in-depth analysis of the factors that affect the productivity of heavy equipment, such as geological conditions, weather, and other factors that may affect the speed of driving. In addition, this research can be used as a reference for technology development and innovation in heavy equipment that is more efficient and has a positive impact on future construction projects.

References

“A Comparison of Occupant Comfort and Satisfaction between a Green Building and a Conventional Building.” 2008. Building and Environment 43 (11): 1858–70. https://doi.org/10.1016/j.buildenv.2007.11.006.

Dwiretnani, Annisaa, and Indra Agustian Daulay. 2019. “Kinerja Alat Hydraulic Static Pile Driver (HSPD) Pada Proyek Perluasan Terminal Bandara Sultan Thaha Jambi.” Jurnal Talenta Sipil 2 (2): 67–81. https://doi.org/10.33087/talentasipil.v2i2.20.

Elbeltagi, 7cf050ac8b40002_emad, 7c73cfdb6f50002_tarek Hegazy, and 7d17fed1e3d0004_adel Eldosouky. 2004. “Dynamic Layout of Construction Temporary Facilities Considering Safety.” Wizdom.ai. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:4(534).

“Embedding ‘green’ in Project-Based Organizations: The Way Ahead in the Construction Industry?” 2015. Journal of Cleaner Production 107 (November): 420–27. https://doi.org/10.1016/j.jclepro.2014.10.024.

“GIS-Based Dynamic Construction Site Material Layout Evaluation for Building Renovation Projects.” 2012. Automation in Construction 27 (November): 40–49. https://doi.org/10.1016/j.autcon.2012.04.007.

Ketut Ariadi, I., Anak Agung Gde Yana, and A. Diah Parami Dewi. 2021. “OPTIMASI KOMBINASI ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG RSUD SANJIWANI GIANYAR.” JURNAL SPEKTRAN 9 (2): 107–14. https://doi.org/10.24843/SPEKTRAN.2021.v09.i02.p02.

Nugroho, Ivan Ardiansyah. 2023. “Pengaruh Program Fit to Work Terhadap Produktifitas Kerja Operator Alat Berat.” Journal of Industrial Hygiene and Occupational Health 7 (2): 114–26. https://doi.org/10.21111/jihoh.v7i2.8655.

PERPEM_PU_No_11-PRT-M. 2013. “Nilai Koefisien Alat.” 2013. http://dpu.balikpapan.go.id/assets/filedownload/PerMen_No_11-PRT-M-2013_Analisa_Harga_Satuan_Pekerjaan_Umum.pdf.

Sidiq, Muhammad Maulana Akbar. 2022. “Analisis Pemilihan Alat Berat Pada Pekerjaan Galian Dan Timbunan.” Jurnal Teknik Sipil 15 (1): 1–13. https://doi.org/10.56444/jts.v15i1.32.

Sokop. 2018. “Analisa Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) Dan Alat Angkut (Dump Truck) Pada Pekerjaan Pematangan Lahan Perumahan Residence Jordan Sea.” 2018. https://ejournal.unsrat.ac.id/index.php/tekno/article/viewFile/22625/22320.

Tripoli, Bambang, Dian Febrianti, and Musliadi Musliadi. 2018. “ANALISA PEMAKAIAN ALAT BERAT EXCAVATOR DENGAN STRAIGHT LINE DAN REDUCING CHARGE METHOD.” Jurnal Teknik Sipil Dan Teknologi Konstruksi 4 (2): 82–91. https://doi.org/10.35308/jts-utu.v4i2.1989.

Wang, Cynthia Changxin, Samad M. E. Sepasgozar, Mudan Wang, Jun Sun, and Xin Ning. 2019. “Green Performance Evaluation System for Energy-Efficiency-Based Planning for Construction Site Layout.” Energies 12 (24): 4620. https://doi.org/10.3390/en12244620.

Welianto, Ari. 2021. “Perkembangan Dan Jenis-Jenis Proyek Konstruksi.” Kompas, January 8, 2021. https://www.kompas.com/skola/read/2021/01/08/170000569/perkembangan-dan-jenis-jenis-proyek-konstruksi.