Comparative Analysis of Planning and Implementation of the Time Schedule for Construction of a 3 Floor Shophouse Structure Using the CPM and PERT Methods (Case Study: Regency Piayu)
Keywords:
Time Management, Time Schedule, Critical Path Method, PERT Network DiagramAbstract
Time management is critical to a project's success because it makes it easier to create controls that guarantee the project is carried out with few deviations and produces satisfactory outcomes with the resources already in place. The PERT and CPM methodologies are designed to describe and establish relationships between various activities and interpret the varying times required for each activity in a comprehensive project plan. The author's investigation focused on the construction of a 3-story shophouse. Based on this investigation, it was found that the planning time to complete the structural work was 50 weeks, while the implementation (realization) was 54 weeks to complete the structural work. In addition, to prevent delays in construction projects, it is necessary to prioritize several tasks designated as critical paths. Using the critical route method, it was discovered that the installation of the first and second floor staircase work, which took longer than expected (15 weeks), was the primary reason for delays compared to the free float given, namely 8 weeks. The results of this study offer valuable suggestions for possible future investigations
References
Abdurrasyid, A., Luqman, L., Haris, A., & Indrianto, I. (2019). Implementasi Metode PERT dan CPM pada Sistem Informasi Manajemen Proyek Pembangunan Kapal. Khazanah Informatika : Jurnal Ilmu Komputer Dan Informatika, 5(1), 28–36. https://doi.org/10.23917/khif.v5i1.7066
Al-Marri Hamad, S. (2019). Effective time management and organisational performance : A case study of Qatar Non-Govermental organisations ( NGOs). June, 1–317.
https://repository.cardiffmet.ac.uk/bitstream/handle/10369/10951/Saleh Hamad Al-Marri - Revised Thesis.pdf?sequence=1&isAllowed=y
Alden Nelson, Adeline Oktalia, Emilya, Lia Willyanto, & Monica Ella. (2023). Analisis Jam Kerja Dan Waktu Lembur Pada Perusahaan Manufaktur Kota BATAM. E-Bisnis : Jurnal Ilmiah Ekonomi Dan Bisnis, 16(1), 181–189. https://doi.org/10.51903/e-bisnis.v16i1.1182
Alobadi, H. A., & Naimi, S. (2023). a Study of Construction Delays. International Journal on Technical and Physical Problems of Engineering, 15(1), 296– 308.
Atin, S., & Lubis, R. (2019). Implementation of Critical Path Method in Project Planning and Scheduling. IOP Conference Series: Materials Science and Engineering, 662(2). https://doi.org/10.1088/1757-899X/662/2/022031
Day, E., Fankhauser, S., Kingsmill, N., Costa, H., & Mavrogianni, A. (2019). Upholding labour productivity under climate change: an assessment of adaptation options. Climate Policy, 19(3), 367–385. https://doi.org/10.1080/14693062.2018.1517640
Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in
Business, 13(1), 20–46. https://doi.org/10.1108/IJMPB-09-2018-0178 Gaur, S. (2022). Understanding the Importance of Project Planning and
Scheduling in Indian Construction Projects. Journal of Positive School Psychology, 2022(3), 3535–3544. http://journalppw.com
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019).
BIM-based Last Planner System tool for improving construction project management. Automation in Construction, 104(June 2018), 246–254. https://doi.org/10.1016/j.autcon.2019.03.019
Kendek, A. T. M., & Rachmawati, F. (2024). Analisis Penjadwalan Probabilistik (Studi Kasus: Proyek Apartemen Grand Shamaya Tower Aubrey). Jurnal Teknik ITS, 13(1). https://doi.org/10.12962/j23373539.v13i1.124937
Lalmi, A., Fernandes, G., & Souad, S. B. (2021). A conceptual hybrid project management model for construction projects. Procedia Computer Science, 181(2019), 921–930. https://doi.org/10.1016/j.procs.2021.01.248
Lugra, W., & Wahib, A. (2016). Potensi Agregat Serta Dampak Yang Timbul Bila Dilakukan Eksploitasi Di Pantai Dan Lepas Pantai Muara Sungai Sambas Kalimantan Barat. Jurnal Geologi Kelautan, 3(2), 9–18. https://doi.org/10.32693/jgk.3.2.2005.124
Müller, R., Drouin, N., & S. (2019). Project Management . Project Management Journal , Modelling Organizational Project Management. Project Management Journal.
Perdana, S., & Rahman, A. (2019). PENERAPAN MANAJEMEN PROYEK
DENGAN METODE CPM (Critical Path Method) PADA PROYEK PEMBANGUNAN SPBE. Amaliah: Jurnal Pengabdian Kepada Masyarakat, 3(1), 242–250. https://doi.org/10.32696/ajpkm.v3i1.235
Prabowo, O. P. W., & Abduh, M. (2023). Pengaruh Penerapan SMK3 Pada Proyek Konstruksi Terhadap Kualitas Pekerjaan (Studi Kasus: Proyek Rehabilitasi Gedung Kantor Kejaksaan Kota Madiun. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 3(1), 1145–1150. https://doi.org/10.22219/skpsppi.v3i1.7987
Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371–381. https://doi.org/10.1080/15623599.2018.1435234
Sa’adah, N., Iqrammah, E., & Rijanto, T. (2022). Evaluasi Proyek Pembangunan Gedung Stroke Center (Paviliun Flamboyan) Menggunakan Metode Critical Path Method (CPM) Dan Crashing. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 3(2), 55–62. https://doi.org/10.26740/proteksi.v3n2.p55-62
Stanitsas, M., Kirytopoulos, K., & Leopoulos, V. (2021). Integrating sustainability indicators into project management: The case of construction industry.
Journal of Cleaner Production, 279, 123774. https://doi.org/10.1016/j.jclepro.2020.123774
Taghipour, M., Seraj, F., Amin, M., & Delivand, M. C. (2020). Evaluating CCPM Method Versus CPM in Multiple Petrochemical Projects. International Technology and Science Publications, 3(3), 1–20. https://doi.org/10.31058/j.mana.2020.32004
Tam, C., Moura, E. J. da C., Oliveira, T., & Varajão, J. (2020). The factors influencing the success of on-going agile software development projects.
International Journal of Project Management, 38(3), 165–176. https://doi.org/10.1016/j.ijproman.2020.02.001
Van Thuyet, N., Ogunlana, S. O., & Kumar Dey, P. (2007). Risk management in oil and gas construction projects in Vietnam. International Journal of Energy Sector Management, 1(2), 175–194. https://doi.org/10.1108/17506220710761582
Zahir, L. A., Si, S., Pd, M., & Suhudi, K. A. (2023). Penjadwalan Proyek Konstruksi Bangunan ( Implementation of Mathematical Modeling Using Genetic Algorithms in Solving Building Construction Project Scheduling Problems ). 03, 62–74.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.