Time And Cost Efficiency Of Conventional Formwork In Building Projects
DOI:
https://doi.org/10.51988/jtsc.v6i1.280Keywords:
Building Construction, Conventional Formwork, Cost, TimeAbstract
In the implementation of the construction of multi-storey buildings, formwork work requires large costs and a long time. Therefore, it is necessary to use a more effective method both in terms of cost and implementation time. Along with the development of technology in the world of construction, there are many formworks that are applied in the field in the structure of project development. In this study, the objectives to be achieved are to analyze costs and time according to the implementation method of formwork work. This study uses a quantitative research method, where the data used includes the unit price of work, volume of work, and the budget plan for the ongoing project. The results of the study show that the estimate of conventional formwork work requires a cost of Rp. 44,360,000,000.00 with a processing time of 59 days.
References
Dewi, R. A., & Sembiring, R. A. (2022). Analisa Perbandingan Penggunaan Bekisting Konvensional Dan Sistem Pada Gedung Bertingkat. Juni, 8(1), 9–14. Retrieved from https://jurnal.unimed.ac.id/2012/index.php/eb/article/download/36078/18640
Ferdinand, F., & Adianto, Y. L. D. (2022). Penerapan Value Engineering pada Proyek Pembangunan Gedung Serbaguna X di Kota Medan. Journal of Sustainable Construction, 1(2), 10–18. https://doi.org/10.26593/josc.v2i1.5696
Graciella, G., & Anondho, B. (2020). Prediksi Durasi Berbasis Earned Schedule Menggunakan Faktor Pengaruh Internal Dan Eksternal Serta Variabel Dummy. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 289. https://doi.org/10.24912/jmts.v3i2.6990
Mamahit, B., Kushartomo, W., & Prabowo, A. (2023). Penilaian Penggunaan Perancah Bagi Keselamatan Dan Kesehatan Kerja. JMTS: Jurnal Mitra Teknik Sipil, 6(3), 619–626. https://doi.org/10.24912/jmts.v6i3.23034
Rahadianto, D., Perwitasari, D., & Mashur, A. R. H. (2022). Analisa Perbandingan Penggunaan Bekisting Aluminium, Bekisting Konvensional, Semi Konvensional Dan Sistem (Peri). Cived, 9(2), 109. https://doi.org/10.24036/cived.v9i2.113909
Rossaty, R., Safitri, R. A., & Nabilah, S. A. (2023). ANALISIS PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL DAN BEKISTING ALUMUNIUM TERHADAP BIAYA DAN WAKTU (Studi Kasus: Proyek Akasa Apartment Tower Kamaya, Bumi Serpong Damai, Tangerang Selatan). Structure, 4(2), 43. https://doi.org/10.31000/civil.v4i2.8062
Sirait, E. G., Welan, P. C., & Tanne, Y. A. (2023). PERBANDINGAN PENGGUNAAN SISTEM BEKISTING KONVENSIONAL DAN ALUMUNIUM PADA PROYEK PEMBANGUNAN MALL X. 4(April).
Studi, P., & Sipil, T. (2022). Semi Sistem Dengan Bekisting. 2(2), 46–51
Sudarjanto, A., Samiono, R., & Salsabilla, Z. (2022). BEKISTING ALUMINIUM TERHADAP BIAYA DAN WAKTU PADA. XI(2), 44–55
Sultan, M. H. (2022, 12 29). ANALISIS RENCANA ANGGARAN BIAYA PELAKSANAAN PEMBANGUNAN KOPERASI TKBM LABUHAN BELAWAN. Retrieved from repositori.uma: https://repositori.uma.ac.id/jspui/bitstream/123456789/19073/2/178110028%20-%20Muhammad%20Sultan%20Hakim%20-%20Fulltext.pdf
Thiyagarajan, R., Panneerselvam, V., & Nagamani, K. (2017). Aluminium Formwork System Using In Highrise Buildings Construction. International Journal of Advanced Research in Engineering and Technology, 8(6), 29–41. Retrieved from http://iaeme.com/Home/issue/IJARET?Volume=8&Issue=6http://iaeme.comhttp://iaeme.com/Home/journal/IJARET30
Waruwu, M. (2023). Pendekatan Penelitian Pendidikan: Metode Penelitian Kualitatif, Metode Penelitian Kuantitatif dan Metode Penelitian Kombinasi (Mixed Method). Jurnal Pendidikan Tambusai , 7(1), 2896–2910.
Yogiswara, R., Andreas, A., & Trisno Lestari, R. (2023). Analisis Faktor Penyebab Keterlambatan Dan Perbandingan Pekerjaan Pemasangan Bekisting Aluminium – Bekisting Konvensional Ditinjau Dari Segi Waktu, Biaya, Dan Mutu. Jurnal ARTESIS, 3(1), 49–61. https://doi.org/10.35814/artesis.v3i1.5022
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.