ANALISA FAKTOR-FAKTOR YANG PALING DOMINAN PENYEBAB KETERLAMBATAN PROYEK
DOI:
https://doi.org/10.51988/jtsc.v2i2.33Keywords:
Project, Construction, Lateness, Flobamora Monument, Pancasila HouseAbstract
The construction of construction projects in Kupang district is currently experiencing a very rapid development, many buildings and roads were built to accommodate the needs of the community. This research focuses on the factors that cause delays that occur in the construction project of the Pancasila Flobamora Monument. This research was completed using a questionnaire distributed to parties directly involved in the process of building the Flobamora monument of the Pancasila house. The results of the study found 5 factors that have the highest importance index value, namely: lack of work experience of masons (68.41%), the influence of rainy weather (66.90%), late delivery of equipment to the project location (52.36%), lack of work experience. field supervisors (43.63%), late payments by the owner (32.29%). Recommendations given are based on the delay that occurred in the construction project of the Pancasila flobamora monument, namely the lack of work experience of masons, Increasing supervision of the masons by increasing the workforce of the head of workers and foremen. The influence of rainy weather, it is better if overtime hours are applied when the weather conditions are not raining so that reduced production due to rain can be overcome, the lack of work experience of field supervisors, providing assistance and direction for less experienced field supervisors.
References
Aal, A. E. 1995. Couse Of Delay In Large Building Construction Project. Teknik Sipil. Journal Vol. 5
Budiman Prabowo. 1999. Keterlambatan Waktu Pelaksanaan Dan Peringkat Dari Penyebab-Penyebab Untuk Proyek Yang Ada Di Wilayah Surabaya
Dipohusodo, Istimawan. 1996. Manajemen Proyek Dan Konstruksi. Yogyakarta : Kanisius
Ervianto. W. I. 2005 , Teori Aplikasimanajeman Proyek Konstruksi Edisi Revisi, Yogyakarta: Penerbit Andi
Gray, C. F. 2006. Manajemen Proyek, New York: Penerbit Andi
Hartono, Lukman. 2013. Pengaruh Aspek Pelaksanaan Konstruksi Terhadap Kinerja Waktu Proyek. Jawa Tengah; Serviensin Lumine Variatis
Hasan, Iqbal. 2011. Pokok-Pokok Materi Statistik 1 (Statistik Deskriptif). Jakarta: Bumi Aksara
Haekal Hasan. 2016. Faktor-Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Dan Alternative Penyelesaiannya (Studi Kasus: Di Manado Town Square Iii)
Hasaloan Banget Sianipar. (2012). Analisis Factor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Konstruksi Dan Pengaruhnya Terhadap Biaya, Di Wilayah Keresidenan Surakarta
Henong, Sebastianus. 2016. Analisa Faktor-Faktor yang Mempengaruhi Keterlambatan Pada Proyek Pemerintahan Di Kota Kupang. Universitas Katolik Widya Mandira Kupang
I.A. Rai Widhiawati. (2009). Bertujuan Untuk Mengetahui Penyebab Utama Dari Keterlambatan Penyelesaian Proyek Konstruksi Yang Berada Di Kotamadya Denpasar
Lulu, Laurensius. 2004. Manajemen Konstruksi Teknik Sipil, Universitas katolik Widya Mandira Kupang.
Suyanto (2009) Bertujuan Untuk Mengetahui Faktor-Faktor Penyebab Keterlambatan Penyelesaian Proyek Yang Berada Di Kotamadya Surakarta Dan Untuk Mengetahui Peringkat Menurut Presepsi Penyedia Jasa Terhadap Factor-Faktor Penyebab Keterlambatan Penyelesaian Proyek
Usboko Gregorius. 2017. Analisis Faktor-Faktor Penyebab Pekerjaan Ulang (Rework) Pada Pekerjaan Konstruksi Bangunan Gedung Di Kota Kupang. Universitas Katolik Widya Mandira Kupang
Downloads
Published
Issue
Section
License
Copyright (c) 2021 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution 4.0 International License.












