ANALISIS PENEMPATAN DAN PENENTUAN JUMLAH TOWER CRANE (TC)
DOI:
https://doi.org/10.51988/jtsc.v2i2.35Keywords:
project schedule planning, curve - s, network planningAbstract
In the construction of Cable Stayed Bridge, the use of heavy construction equipment is absolutely necessary, especially required for positioning and selecting the type of Tower Crane in order to improve construction performance. Therefore, human resources and heavy equipment used in the construction process will significantly affect the period of project implementation. Proper planning of the location for various construction equipment is believed to be the key of efficiency and productivity. Tower Crane as the target optimization is one of the equipment that has a big role in transporting the materials for the construction of a multi- storey building so that it requires proper planning to be able to serve all points of demand from its position.
References
Iman Soeharto, Ir. “Manajemen Proyek “, Erlangga, Jakarta 1997.
Istimawan Dipohusodo “Manajemen Proyek dan Konstruksi” Jilid 1, Kanisius,Yogyakarta, 1996.
Soegeng Djojowirono “Manajemen Konstruksi 1” Edisi Kedua, 1991.
Peraturan Presiden Republik Indonesia “Undang-Undang Jasa Konstruksi” 1999. Peraturan Presiden Republik Indonesia “Undang-Undang Bangunan Gedung ”
PT. PP (Persero) “Buku referens Untuk Kotraktor Bangunan Gedungdan Sipil”
Gramedia, Jakarta, 2002
Rostianti, Susy Fatena “Alat Berat Untuk Proyek Konstruksi”, RinekaCipta, Jakarta,
Rahman, Sofyan “Optimasi Lokasi untuk Grup Tower Crane Pada Proyek”
Penelitian, Institut Negeri sepuluh Nopember, 2012.
Downloads
Published
Issue
Section
License
Copyright (c) 2021 Jurnal Teknik Sipil Cendekia (JTSC)
This work is licensed under a Creative Commons Attribution 4.0 International License.