ANALISIS MANAJEMEN RESIKO STRUKTUR BAWAH PADA PROYEK PEMBANGUNAN BANGUNAN TOKO DI KOTA JAYAPURA
DOI:
https://doi.org/10.51988/jtsc.v3i1.39Keywords:
Risk Management, PROMETHEE, RiskAbstract
Some of the work on the substructure of the building, namely foundations (pile, bore pile, sole), soil excavation, pile cap and sloof, raft foundation, retaining wall, waterproofing, backfill and compaction. Based on the implementation method, the sub-building structure has complex and complex work characteristics, so it is very vulnerable to the occurrence of risks in the construction implementation. The PROMETHEE method is used in research to follow up the Risk Breakdown Structure method in order to obtain a comprehensive or comprehensive rating of the main risks in a project. The results showed that the unpredictable external risks, namely inflation/price increases and the decline in people's purchasing power are the highest potential risks. Risk mitigation related to inflation/price increases should be carried out more slowly at the beginning of the project because inflation is national. Then wait until the economy improves and if funds are still available, all materials can be purchased or contracted firs
References
Brans, J.P, Mareschal, B., Vincke, P. (1986). “How to Select and Rank Projects: The PROMETHEE Method”, European Journal of Operations Research, Vol. 24, 228-238
Burtonshaw-Gunn, S.A. (2008), The Essential Management Toolbox, Wiley, England.
CII. (1989). Management of Project Risks and Uncertainties. Construction Industry Institute, Publication p : 6–8.
Duffield, C & Trigunarsyah, B., 1999. Project Management-Conception to Completion. Engineering Education Australia (EEA). Australia.
Ervianto, W. I. (2005), Manajemen Proyek Konstruksi,. Penerbit Andi, Yogyakarta.
Fisk, E.R. (1997), Construction Project Administration. Fifth Edition, Prentice Hall, New Jersey.
Flanagan, R & Norman, G. (1993), Risk Management and Construction, Blackwell Science, London.
Grapier. (2008). Journal of Management in Engineering, vol 12, no.2
Kerzner, H. (2001), Project Management. Seventh Edition, John Wiley & Sons, Inc, New York.
Kusrini. (2007), Konsep dan Aplikasi Sistem Pendukung Keputusan, Yogyakarta : Andi Offset.
Mangeke, F. (2021). “Analisis Manajemen Risiko Khusus Struktur Bawah Pada Proyek Pembangunan Gedung Bertingkat Di Kota Jayapura”. Skripsi, Jurusan Teknik Sipil, Universitas Cenderawasih, Jayapura.
Marzuki. (2002), Metodologi Riset, Yogyakarta: BPFE UII, Madcoms, Database.
Mc Leod, Raymond. (1995), Sistem Informasi Manajemen, Klaten: PT. Tema Baru
Power, D.J. (1999), A Brief History of Decision Support Systems, DSS Resources.COM, http://DSSResources.COM/history/dsshistory.html.
Project Managemen Institut. (2008), Project Management Body of Knowledge (PMBOK), Fourth Edition.
Ramdani, Ali, Suryadi, Kadarsah. (1998), Sistem Pendukung Keputusan, PT. Remaja Rosdakarya, Bandung.
Smith, N.J., (1999), Managing Risk in Construction Projects, Blackwell Science, Oxford
Wayangkau, H. (2014). “Analisis Manajemen Risiko Pada Proyek Pembangunan Bendungan (Studi Kasus : Bendungan Titab di Bali, Bendungan Jatibarang di Kabupaten Semarang, dan Bendungan Diponegoro di Semarang)”. Tesis, Magister Teknik Sipil Universitas Diponegoro, Semarang.
Wideman. M. (1992), Project and Program Risk Managemen A guide to Managing Project Risks and Opportunities, A Publication of the Project Management Institute Four Campus Boulevard, Newtown Square, Pennsylvania, USA.
William, T.M. (1996). “The two-dimensionality of project risk”. International Journal of Project Management, 14, 185–6.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution 4.0 International License.