FAKTOR YANG MEMENGARUHI KEMITRAAN KONTRAKTOR DAN PERANCANG DALAM PROYEK DESIGN AND BUILD
DOI:
https://doi.org/10.51988/jtsc.v7i1.413Keywords:
design & build, project delivery system, kontraktor, perancang, kinerja proyekAbstract
The government is currently encouraging readiness in government projects using the Design & Build project delivery system, as regulated in the Construction Services Law No. 7 of 2017. Design and Build (DB) from various previous literature has been proven to provide advantages compared to Design Bid Build (DBB) including speed of implementation, project risks, design changes and the absence of change orders during project implementation. This study aims to examine what factors influence the partnership of contractors and designers in design and build projects to produce good project performance including cost, quality, time, K3 and environment. The research method used in this study is a quantitative method with 50 respondents and processed through SPSS to explore respondents' perceptions, about factors that are considered to influence the partnership of contractors and designers in Design and Build (DB) projects. The respondents came from contractors and consultants who have worked on government projects with design & build project delivery. The results of this study indicate six key factors influencing contractor–designer partnerships in Design and Build projects, including relationship factors, process factors, and environmental factors, with partnership maturity acting as a moderating variable. These factors contribute to improved project performance in terms of cost, quality, time, safety, and environmental aspects. The findings provide practical insights for contractors and designers in strengthening collaboration and readiness for implementing Design and Build project delivery systems.
References
Ashcraft, H. (2022). Transforming project delivery: integrated project delivery. Oxford Review of Economic Policy, 38(2), 369–384. https://doi.org/10.1093/oxrep/grac001
Asmar, M. El, Asce, M., Hanna, A. S., Asce, F., & Loh, W.-Y. (2013). Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. https://doi.org/doi:10.1061/(asce)co.1943-7862.0000744
Bigwanto, A., Widayati, N., Wibowo, M. A., & Sari, E. M. (2024). Lean Construction: A Sustainability Operation for Government Projects. Sustainability, 16(8), 3386. https://doi.org/10.3390/su16083386
Crowley, L. G., & Karim, M. A. (1995). Conceptual Model Of Partnering.
El Asmar, M., Lotfallah, W., Whited, G., Asce, M., Hanna, A. S., & Asce, F. (2010). Quantitative Methods for Design-Build Team Selection. Journal Construction Engineering Management , 136(1), 904–912. https://doi.org/10.1061/ASCECO.1943-7862.0000194
Katar, I. M. (2019). Enhancing the Project Delivery Quality; Lean Construction Concepts of Design-Build & Design-Bid-Build Methods. International Journal of Management, 10(6), 324–337. https://doi.org/DOI: 10.34218/IJM.10.6.2019.031
Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2004). Benchmarking design-build procurement systems in construction. In Benchmarking (Vol. 11, Issue 3, pp. 287–302). Emerald Group Publishing Ltd. https://doi.org/10.1108/14635770410538763
Maura Muzdhalifa, R., Pahang Putra, I. N. D., & Widowati, E. D. (2025). Implementasi Bim (Building Information Modeling) Terhadap Peningkatan Efisiensi Dan Akurasi Pada Perhitungan Estimasi Biaya Proyek Pembangunan Jalan Jalur Lintas Selatan (Jls) Lot 3 Pantai Serang – Sumbersih. Jurnal Teknik SIPIL CENDEKIA (JTSC), 6(2). https://doi.org/10.51988/jtsc.v6i2.323
Mesa, H. A., Molenaar, K. R., & Alarcón, L. F. (2019). Comparative analysis between integrated project delivery and lean project delivery. International Journal of Project Management, 37(3), 395–409. https://doi.org/10.1016/j.ijproman.2019.01.012
Ng, W., Seng, A., & Md, Y. (2006). The Success Factors Of Design And Build Procurement Method: A Literature Visit.
Palilati, M. P., Doda, N., Dwi, R., & Sum, M. ’. (2024). Analisis Faktor Penyebab Keterlambatan Terhadap Pelaksanaan Proyek Konstruksi (Vol. 5, Issue 2).
Sari, E. M., Irawan, A. P., Wibowo, M. A., Siregar, J. P., & Praja, A. K. A. (2023). Project Delivery Systems: The Partnering Concept in Integrated and Non-Integrated Construction Projects. Sustainability (Switzerland), 15(1). https://doi.org/10.3390/su15010086
Sari, E. M., Irawan, A. P., Wibowo, M. A., Siregar, J. P., Tamin, R. Z., Praja, A. K. A., & Dewi, M. P. (2023). Challenge and Awareness for Implemented Integrated Project Delivery (IPD) in Indonesian Projects. Buildings, 13(1). https://doi.org/10.3390/buildings13010262
Sullivan, J., Asmar, M. El, Chalhoub, J., & Obeid, H. (2017). Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Journal of Construction Engineering and Management, 143(6). https://doi.org/10.1061/(asce)co.1943-7862.0001282
Thompson, P. J., Sanders, S. R., & Member, A. (1998). Partnering Continuum (Journal of Management Engineering & Vol 14 issued 1, Trans.).
V. Nabut, Y., B. Henong, S., & H. Pattiraja, A. (2021). Analisa Faktor-Faktor Yang Paling Dominan Penyebab Keterlambatan Proyek. Jurnal Teknik Sipil Cendekia (JTSC), 2(2), 1–9. https://doi.org/10.51988/jtsc.v2i2.33
Xia, B., Chen, Q., Xu, Y., Li, M., & Jin, X. (2015). Design-Build Contractor Selection for Public Sustainable Buildings. Journal of Management in Engineering, 31(5). https://doi.org/10.1061/(asce)me.1943-5479.0000295
Yamanouchi, T. (2019). Design-Build Implementation in Japan: Lessons Learned.
Yean, F., Ling, Y., Fu, E., & Leong, K. (2021). Performance Of Design-Build Projects In Terms Of Cost, Quality And Time: Views Of Clients, Architects And Contractors In Singapore. In Australian Journal Of Construction Economics And Building (Vol. 2, Issue 1).
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.