ANALISIS FAKTOR-FAKTOR PENYEBAB PEKERJAAN ULANG (REWORK) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DI KOTA KUPANG
DOI:
https://doi.org/10.51988/jtsc.v3i1.44Keywords:
Rework, Building, Kupang CityAbstract
Implementation of a building construction project carried out through a certain management system. The project has a predetermined schedule and implementation plan. Common things that will occur if they are not in accordance with the schedule and implementation plan are delays in project implementation time and implementation costs. One of the factors causing the delay is due to rework activities on one or several items of construction work. The purpose of this study was to identify and analyze the factors that cause rework on building construction projects in the city of Kupang, East Nusa Tenggara Province. This study used a questionnaire instrument involving as many as 27 contractors, consisting of 12 site managers, 12 field implementers and 3 foreman. This research was conducted to see the dominant factor of rework in building construction projects in Kupang city. The results showed that the factors causing rework are known from managerial, design and resource factors which are the main causes of the emergence of rework in work. Operators working not according to procedures are one of the main causes of rework from the resource factor. Lack of teamwork is the cause of the rework of managerial factors. Unclear design or documentation is the cause of rework of design factors.
References
Dipohusodo, Istimawan. 1996. Manajemen Proyek dan Konstruksi. Yogyakarta : Kanisius
Erick, et al.,2014.Model dan Sumber Penyebab Rework pada Tahapan Proyek Konstruksi. Glasglow. Volume 3, No.4
Henong Sebastianus, 2016. Analisis Faktor-Faktor Yang Mempengaruhi Keterlambatan Pada Proyek Pemerintahan Di Kota Kupang. Prosiding Seminar Nasional Teknik Sipil, Fakultas Teknik Universitas Muhammadiyah Surakarta, 2016 ISSN: 2459-9727
Hidayat A, et al., 2010. Faktor-faktor Penyebab Pekerjaan Ulang (Rework) yang Berkaitan dengan Manajerial pada Proyek Konstruksi Jalan di Kabupaten Rokan Hulu.CED.Volume 1, No.1
Juliana H. Februari 2011. Kajian Pola Rework pada Pelaksanaan Pekerjaan Finishing Perumahan di Surabaya. Prosiding seminar nasional manajemen teknologi XIII. Volume 7, No.2.
Kukuh, et al., Juli 2011. Analisa Rework pada Konstruksi Gedung di Kabupaten Bondowoso. Prosiding seminar nasional manajemen teknologi XIV. Volume 8, No.1.
Nurhayati.2010. Manajemen Proyek. Graha ilmu : Medan
Prianto, Kusnul. 2012. Analisa Faktor Penyebab Pekerjaan Ulang pada Proyek Konstruksi di Kota Malang. Alfabeta. Volume 10, No.2.
Rahmatul, et al., Agustus 2012. Faktor-faktor Penyebab Pekerjaan Ulang (Rework) pada Pembangunan Gedung Dinas Bina Marga dan Cipta Karya Unsyiah. Pasca sarjana universitas syiah kuala. Volume 1, No.1.
Reksohadiprodjo, Sukanto.1983. Manajemen Proyek. Yogyakarta : BPFE
Ryan Ariefasa. Faktor Penyebab Keterlambatan Pekerjaan Konstruksi Bangunan Gedung Bertingkat yang Berpengaruh terhadap Perubahan Biaya pada Pekerjaan Struktur. Skripsi Program Sarjana Strata I Universitas Indonesia. Jakarta, 2012
Santosa, Budi. 2008. Manajemen Proyek. Surabaya : Graha Ilmu
Sugiyono.2013. Metode Penelitian Kombiinas. Bandung : Alfabeta
Sugiyono.2014.Metode Penelitian Pendidikan..Bandung : Alfabeta
Sugiyono. 2013. Statistika untuk Penelitian. Bandung : Alfabeta
Sutrisna, et al., Juli 2013. Analisis Rework pada Proyek Konstruksi Gedung di Kabupaten Bandung. Alfabeta. Volume 1, No.2
Yuni, et al., 2013. Faktor-faktor Penyebab Pekerjaan Ulang (Rework) pada Proyek Gedung di Kabupaten Rokan Hulu berdasarkan Persepsi Kontraktor.CED.Volume 1, No.1.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution 4.0 International License.