PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PROYEK FAMILIA URBAN BEKASI
DOI:
https://doi.org/10.51988/jtsc.v3i2.48Keywords:
Earned Value, Cost and Time, Cost Estimates, Time Estimates, FinesAbstract
Project management is the process of planning, coordinating organization, and controlling resources so that objectives are achieved effectively and efficiently. This study aims to determine the performance of the project in terms of cost and time conditions with the earned value method on the Bekasi Urban Familia Housing Development Project. The method in this study uses quantitative methods, quantitative research is research on data that is numerical and tends to use analysis. The method used is by field observations, interviews with implementing contractors, and data processing from the field such as working drawings and basic unit prices. Based on the results of the study, the actual cost of the 18th week was Rp. 2,859,922,545.75, while the planned budget for that week was Rp. 3,381,087,652.62. Project performance in the form of actual progress weights issued until that week was 58.04% while in that week it was planned to be 67.98%. Estimated cost and time projections at the end of the project are obtained that the cost to complete the remaining work during that time (BETC) is IDR 897,934,488.98 and the total cost the final amount (EAC) was Rp. 4,927,465,511.02. The time to complete the project (SETC) is 151 days with a total planning time of 147 days. Due to the delay in project completion, the contractor will be fined Rp. 23,301,600 the total final cost of the project according to the work contract is Rp. Rp 4,950,767,111.02.
References
Agatha, Khrisna. 2018. Pengendalian Biaya dan Jadwal Proyek dengan Menggunakan Nilai Hasil (Proyek Rehabilitasi Gedung X Gresik). Jurnal Mahasiswa Universitas Negeri Surabaya.
Castollani, Alief, Sarjono Puro. 2020. Analisis Biaya dan Waktu pada Proyek Apartemen Dengan Metode Earned Value Concept. Jurnal Rekayasa Konstruksi Mekanika Sipil, Vol. 03, No. 01.
Dumadi, T. A. (2016). Evaluasi Pelaksanaan Proyek Menggunakan Metode Earned Value Analysis. Surakarta: Jurnal Ilmiah.
Febri, E. R. D. (2015). Analisa Kinerja Biaya dan Waktu dengan Metode Nilai Hasil (Earned Value Analysis) Pada Pekerjaan Renovasi Tahap II Asrama Wana Mulia SMK Kehutanan Samarinda. Samarinda : Universitas 17 Agustus 1945 Samarinda.
Gembira Deden Yahya, Idar. 2013. Studi Pengendalian Biaya dan Jadwal Proyek dengan Menggunakan Nilai Hasil. Makassar : Universitas Hasanuddin.
Hana, W. (2016). Pengendalian Waktu dan Biaya Pembangunan Jember Icon Fase Dua Dengan Critical Path Metod. Jember : Universitas Jember.
Izeul dan Retno. (2014). Metode Earned Value Untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan Pada Proyek Pembangunan Condotel de Vasa Surabaya. Jurnal Teknik Sipil, Surabaya.
Janizar, Syapril, Felix Setiawan, Rina Rahmawati. 2021. Perkiraan Waktu Dalam Penyelesaian Proyek Kolam Retensi Sirnaraga Menggunakan Penerapan EVA (Earned Value Analysis). Jurnal Geoplanart, Vol 3 No 2.
Kartikasari, D (2016). Analisa Pengendalian Biaya dan Waktu dengan Konsep Nilai Hasia (Earned Value) (Studi Kasus : Fabrikasi Steel Structure Slag Storage Gresik). Jurnal Teknik, Vol.7, No.1.
Mukti, Aga Teja. 2018. Evaluasi Biaya dan Waktu Pembangunan Kapal Landing Platform Dock (LDP) Dengan Metode Earned Value Analysis. Institut Teknologi Sepuluh Nopember Surabaya.
Nabut, Yovantianus V., Sebastianus B. Henong & Agustinus H. Pattiraja. 2021. Analisa Faktor-Faktor Yang Paling Dominan Penyebabketerlambatan Proyek. Jurnal Teknik Sipil Cendekia, Vol 2 No 2.
Prasetya, Eka Budhy. 2019. Aplikasi Manajemen Proyek Konstruksi Dengan Metode Critical Path dan Earned Value Management. Jurnal RESISTOR, Vol. 1 No. 02.
Priyo, M., & K. F. Indraga. 2015. Analisis Kinerja Biaya Dan Jadwal Terpadu Dengan Konsep Earned Value Method (Studi Kasus: Proyek Pembangunan Gedung). JURNAL ILMIAH SEMESTA TEKNIKA, Vol. 18 No. 2.
Radiyna, Ahmadikhtiyar.2015. Analisis Kinerja Proyek Pembangunan Kapal Dengan Metode Earned Value Analysis (EVA). Institut Teknologi Sepuluh Nopember Surabaya.
Setiawan, Felix & Syapril Janizar. 2021. Percepatan Jadwal Konstruksi Danpengaruhnya Terhadap Biaya Penyelesaian Proyek Konstruksi. Jurnal Teknik Sipil Cendekia, Vol 2 No 1.
Sitanggang, Nathanael. Dkk. 2019. Pengantar Konsep Manajemen Proyek untuk Teknik. Medan : Penerbit Yayasan Kita Menulis.
Soeharto, I. (1995). Manajemen Proyek : Dari Konseptual Sampai Operasional. Jakarta : Penerbit Erlangga S.
Thoengsal, James. 2016. Jenis-jenis Model Penjadwalan Pada Proyek Konstruksi.http://jamesthoengsal.blogspot.com/p/blog-page_45.html. Diakses Pada Tanggal 25 Februari 2017 Pukul 21.28.
Yanuar, Krisdianto. 2015. Evaluasi Biaya Dan Waktu Proyek Reparasi Kapal Dengan Metode Earned Value Analysis (EVA). Institut Teknologi Sepuluh Nopember Surabaya.
Yulita Ratih,Silvia, Dody Irnawan. 2020. Analisis Proyeksi Jadwal Dan Biaya Akhir Dengan Konsep Nilai Hasil Pada Proyek Konstruksi. Jurnal Rekayasa Konstruksi Mekanika Sipil, Vol. 03, No. 02
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution 4.0 International License.