Cost And Time Analysis Using Time Cost Trade Off (TCTO) In Order To Catch Up With Execution Time (Case Study: Jakarta Islamic Hospital Pondok Kopi Construction Project)
DOI:
https://doi.org/10.51988/jtsc.v7i2.522Keywords:
Optimasi, Cost, Time Cost Trade Off, TimeAbstract
In a construction project, there are three crucial aspects to consider, namely time, cost, and quality. The implementation of the Jakarta Islamic Hospital Pondok Kopi construction project faces several obstacles, especially at the stage of foundation structure and concrete structure work. Based on observations at the location, it is estimated that the completion of the construction of the Jakarta Islamic Hospital Pondok Kopi will be delayed or not in accordance with the planned schedule. There are several options that can be used to speed up project activities, including increasing working hours (overtime), adding manpower, adding or changing tools, adding more effective work methods, and other options. Of the several available alternatives, this study will apply two alternatives, namely increasing working hours (overtime) and increasing labor using the Time Cost Trade Off (TCTO) method. The optimization alternative that has the most optimal or efficient total cost and duration is by adding 5 workers because the project duration becomes faster, even though there is an increase in cost, the addition is more optimal or efficient compared to other alternatives, as indicated by a time efficiency of 51,36% and a cost efficiency of -20,02%. This optimization result can be used as an acceleration option for the project party.
References
E. A. Budianto and A. E. Husin, “Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Proyek Gudang Amunisi.,” Jurnal Aplikasi Teknik Sipil. 2021. [Online]. Available: https://www.researchgate.net/profile/Albert-Husin/publication/354248886_Analisis_Optimasi_Waktu_dan_Biaya_Dengan_Metode_Time_Cost_Trade_Off_pada_Proyek_Gudang_Amunisi/links/612e4d530360302a006f0dd0/Analisis-Optimasi-Waktu-Dan-Biaya-Dengan-Metode-Time-Cost
D. Fahrul, O. Jamlaay, and M. Abdin, “Optimalisasi Waktu Dan Biaya Pembangunan Gedung Asrama Haji Embarkasi Transit Waiheru Ambon Dengan Menggunakan Metode Time Cost Trade Off,” J. Agreg., 2023, [Online]. Available: https://www.ejournal-polnam.ac.id/index.php/JA/article/view/1425
L. A. Zahir, “STRATEGI OPTIMASI WAKTU DAN BIAYA MENGGUNAKAN TIME COST TRADE OFF (TCTO) PADA PEMBANGUNAN GEDUNG RUANG KELAS SMPN 1 BESUKI,” J. DAKTILITAS, 2021, [Online]. Available: https://journal.unita.ac.id/index.php/daktilitas/article/view/442
A. Anggraini and E. Dwiantoro, “Analisa Optimasi Biaya dan Waktu Pelaksanaan Proyek Kontruksi Dengan Penambahan Jam Kerja dan Penambahan Tenaga Kerja Berdasarkan Metode Time Cost Trade Off ( Studi Kasus?: Penanganan Jalan Muara Sahung – Naga Rantai Kabupaten Kaur Provinsi Bengkulu ),” vol. 4, no. 4, pp. 4456–4462, 2025.
A. P. Erfaliani, J. D. Pradika, I. Hendriyani, and R. Pratiwi, “Analisis Waktu dan Biaya pada Proyek Pembangunan Pasar Induk Senaken Kabupaten Paser dengan Metode Time Cost Trade Off ( TCTO ),” vol. 8, no. 2, pp. 297–308, 2024.
R. Arvianto, F. Sri Handayani, and Setiono, “OPTIMASI BIAYA DAN WAKTU DENGAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus Proyek Bangunan Rawat Inap Kelas III dan Parkir RSUD Dr. Moewardi Surakarta),” e-Jurnal Matriks Tek. Sipil, pp. 69–74, 2017.
A. Aditama, A. Azizi, D. Laras, and S. Ningsih, “Analisis Biaya dan Waktu Dengan Metode Time Cost Trade Off pada Proyek Pembangunan Gedung Food Court pada Kawasan Lapangan Eks Batalyon Cilacap Analysis Cost and Time Using the Time Cost Trade Off Method in the Food Court Building Construction Project in the Ex-Battalion Cilacap Field Area,” vol. 7, no. 1, pp. 47–54, 2026.
D. Q. Supriyor, “ANALISIS OPTIMASI BIAYA DAN WAKTU PROYEK DENGAN METODE TIME COST TRADE OFF MENGGUNAKAN APLIKASI PRIMAVERA P6 ( STUDI KASUS PROYEK PENATAAN KORIDOR JL . IR . JUANDA ,” vol. 10, no. 2, pp. 90–97, 2022.
N. Fitri, R. Situmorang, and O. Lhara, “Analisis optimasi waktu dan biaya proyek dengan metode time cost trade off dan fast track pada pekerjaan penanganan longsor,” vol. 6, no. 2, pp. 21–29, 2023.
T. B. SARONO, “Analisis Pertukaran Waktu Dan Biaya Dengan Metode Time Cost Trade Off (Tcto) Pada Proyek Pembangunan Kantor KELURAHAN SIDODADI KOTA SAMARINDA,” KURVA Mhs., 2022, [Online]. Available: http://ejurnal.untag-smd.ac.id/index.php/TEK/article/view/5998
O. Waktu, D. A. N. Biaya, P. Gedung, and A. Haji, “Journal agregate vol. 2, no. 1, maret 2023,” vol. 2, no. 1, pp. 1–11, 2023.
A. N. Hidayah and A. Setyawan, “OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE OFF ( STUDI KASUS?: PROYEK SPAM REGIONAL WOSUSOKAS SEGMEN 4 , PIPA DISTRIBUSI UTAMA DUWET – MOJOLABAN ),” vol. 17, 2024.
M. A. Rahima, “PENERAPAN METODE CPM ( CRITICAL PATH METHODE ) PADA PROYEK PEMBANGUNAN JARINGAN FIBER OPTIK TASANGKA BUKIT OLEH?: D iajukan untuk memenuhi sebagai persyaratan guna menyelesaikan program Diploma Tiga Jurusan / Program Studi Teknik Industri Agro POLITEKNIK ATI MAKASSAR,” 2021.
F. K. Wibowo et al., “Optimasi waktu dan biaya dengan metode crashing pada proyek pembangunan rumah susun,” pp. 1–12, 2018.
S. Kasus, R. Jalan, H. Kelurahan, and R. Lingkungan, Metode penjadwalan waktu kerja (kurva s), vol. 6. 2022.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.