Electrical Project Model Using the Local Component Level (TKDN) in Government Building Construction

Authors

  • Mas’ud Dohim Civil Engineering Doctoral Program, Faculty of Engineering, Universitas Tarumanagara, Jakarta Barat 11440, Indonesia; dian.328232002@stu.untar.ac.id
  • Dyah Erny Herwindiati Faculty of Information Technology, Universitas Tarumanagara, Jakarta Barat 11440, Indonesia; dyahh@fti.untar.ac.id
  • Endah Murtiana Sari Industrial Engineering, Universitas Sains Indonesia, Bekasi, Indonesia

DOI:

https://doi.org/10.51988/jtsc.v7i3.642

Keywords:

Local Component Level (TKDN, Government Building Construction, Electrical Work, SEM-PLS, Implementation Model

Abstract

The implementation of TKDN level in electrical work is one of the government's strategic policies to enhance national industrial competitiveness, reduce dependence on imported products, and support sustainable infrastructure development. However, the implementation of TKDN in government building construction projects still faces various obstacles, such as the limited availability of TKDN-certified products, low integration between planning and procurement, and the absence of a model capable of explaining the factors that influence the level of TKDN implementation. This study aims to develop an electrical work model using the TKDN level in government building construction by identifying the factors that influence its implementation and analyzing the relationships among these factors with respect to the success of TKDN implementation. The study employed a quantitative approach through the distribution of questionnaires to 210 respondents; the data were then analyzed using Structural Equation Modeling–Partial Least Squares (SEM-PLS) to test the relationships among variables and to construct an empirical model. The results produced a model explaining the influence of the unit price of electrical work, electrical material, labor, electrical equipment, and TKDN policy on the level of TKDN implementation, as well as its impact on project performance. The novelty of this study lies in the development of a TKDN implementation model for electrical work that integrates regulatory compliance and supervision, technical, and managerial aspects within a single empirical framework. The resulting model is expected to serve as a basis for decision-making  in increasing the use of domestic products in government building projects.

References

B. Flyvbjerg, “How Big Things Get Done,” Oxford University Press, 2022.

B. Flyvbjerg, “Top ten behavioral biases in project management: An overview,” Project Management Journal, vol. 52, no. 6, pp. 531–546, 2021.

World Bank, “World Development Report 1994: Infrastructure for Development,” World Development Report, Oxford University Press for the World Bank, 978-0-1952-0879-8, pp. 1–254, Jun. 1994.

World Bank, “The World Bank Annual Report 2022: Helping Countries Adapt to a Changing World,” Washington, DC, 2022. Accessed: Sep. 08, 2025. [Online]. Available: https://openknowledge.worldbank.org/handle/10986/38050

T. Hidayat, R. E. Putera, and H. Koeswara, “Analisis Kebijakan Penerapan Tingkat Komponen Dalam Negeri (TKDN) dalam Pengadaan Barang dan Jasa di Kementerian Pendidikan, Kebudayaan, Riset, dan Teknologi: Studi Kasus di Biro Umum dan Pengadaan,” Jurnal Ilmu Administrasi Negara ASIAN (Asosiasi Ilmuwan Administrasi Negara), vol. 12, no. 1, pp. 85–94, 2024.

Kementerian Perindustrian, Peraturan Menteri Perindustrian Nomor 16 Tahun 2011 Tentang Ketentuan dan Tata Cara Penghitungan Nilai Tingkat Kandungan Dalam Negeri (TKDN) . Indonesia: https://peraturan.bpk.go.id/Home/Details/142371/permenperin-no-16-m-ind-per-2-2011, 2011.

J. Black, “Risk and regulatory policy: improving the governance of risk,” OECD Reviews of Regulatory Reform. In Risk-based regulation: Choices, practices and lessons being learnt. Paris: OECD, 2010.

Adetoyese Latilo, Ngozi Samuel Uzougbo, Munachi Chikodili Ugwu, Portia Oduro, and Onoriode Reginald Aziza, “Developing legal frameworks for successful engineering, procurement, and construction projects,” International Journal of Applied Research in Social Sciences, vol. 6, no. 8, pp. 1868–1883, Aug. 2024, doi: 10.51594/ijarss.v6i8.1430.

H. T. Nguyen and B. Hadikusumo, “Impacts of human resource development on engineering, procurement, and construction project success,” Built Environment Project and Asset Management, vol. 7, no. 1, pp. 73–85, 2017, doi: 10.1108/BEPAM-04-2016-0010.

H. E. Mutikanga, M. Abdul Nabi, G. G. Ali, I. H. El-adaway, and A. Caldwell, “Postaward Construction and Contract Management of Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda,” Journal of Management in Engineering, vol. 38, no. 6, Nov. 2022, doi: 10.1061/(asce)me.1943-5479.0001088.

A. , H. K. , & H. C. Ashworth, “Willis’s Practice and Procedure for the Quantity Surveyor,” Oxford: Wiley-Blackwell, no. 14, 2018.

Kementerian Perindustrian, “Rekapitulasi Data Sertifikat TKDN,” Jakarta, 2024. Accessed: Sep. 08, 2025. [Online]. Available: https://tkdn.kemenperin.go.id/rekap.php

Peraturan Menteri PPN/Kepala Bappenas, Peraturan Menteri PPN/Kepala Bappenas Nomor 8 Tahun 2023 tentang Perubahan atas Rencana Strategis Kementerian PPN/Bappenas Tahun 2020–2024. 2023, pp. 1–19.

P. E. D. Love, “Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects,” Journal of Construction Engineering and Management , vol. 128, pp. 18–29, 2002, doi: 10.1061/ASCE0733-93642002128:118.

K. M. Briggs, F. A. Loveridge, and S. Glendinning, “Failures in transport infrastructure embankments,” Eng. Geol., vol. 219, pp. 107–117, Mar. 2017, doi: 10.1016/j.enggeo.2016.07.016.

P. E. D. Love, P. Teo, and J. Morrison, “Revisiting Quality Failure Costs in Construction,” J. Constr. Eng. Manag., vol. 144, no. 2, Feb. 2018, doi: 10.1061/(asce)co.1943-7862.0001427.

P. Erik Eriksson, “A Case Study Of Partnering In Lean Construction,” 2009.

E. Osipova and P. E. Eriksson, “How procurement options influence risk management in construction projects,” Construction Management and Economics, vol. 29, no. 11, pp. 1149–1158, Nov. 2011, doi: 10.1080/01446193.2011.639379.

J. F. Hair, C. M. Ringle, and M. Sarstedt, “PLS-SEM: Indeed a silver bullet,” Journal of Marketing Theory and Practice, vol. 19, no. 2, pp. 139–152, Apr. 2011, doi: 10.2753/MTP1069-6679190202.

J. Risher and J. F. Hair, “The Robustness of PLS Across Disciplines,” 2017. Accessed: Apr. 17, 2025. [Online]. Available: University of South Alabama

J. F. Hair, M. Hult, C. M. Ringle, and M. Sarstedt, “A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM),” 2022. [Online]. Available: https://www.researchgate.net/publication/354331182

S. K. Yaman, N. M. Yusop, N. E. Hashim, H. Mohammad, and H. A. Bakar, “Factors affecting quality in construction project life cycle (CPLC),” International Journal of Integrated Engineering, vol. 14, no. 1, pp. 322–335, 2022.

J. , R. C. M. , & S. M. Henseler, “A new criterion for assessing discriminant validity in variance-based structural equation modeling,” J. Acad. Mark. Sci., vol. 43, no. 1, pp. 115–135, 2015.

C. , T. W. , & A. D. Aigbavboa, “Cost management practices in construction projects: A systematic review,” Building, vol. 12, no. 9, 2022.

P. E. D. Love, D. J. Edwards, and Z. Irani, “Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns,” IEEE Trans. Eng. Manag., vol. 59, no. 4, pp. 560–571, 2012, doi: 10.1109/TEM.2011.2163628.

M. R. , C. N. , & U. C. Hosseini, “Supply chain resilience in construction: Current status and future directions,” Engineering, Construction and Architectural Management, vol. 30, no. 6, pp. 3418–3442, 2023.

R. , & C. A. P. C. Osei-Kyei, “Sustainable construction supply chains: A review of current practices and future research,” J. Clean. Prod., 2022.

H. , N. T. , & L. Q. Pham, “Workforce competence and project success in construction,” Buildings, vol. 13, no. 6, 2023.

M. , & L. B. T. H. Loosemore, “Human capital and skills development in construction: A review of contemporary challenges,” Construction Management and Economics, vol. 41, no. 9, pp. 733–750, 2023.

W. , & Z. L. Pan, “Construction equipment modernization and project performance: Evidence from infrastructure projects,” Buildings, vol. 13, no. 7, 2023.

M. A. , G. V. A. , & O. M. Abdelmegid, “Digital technologies and productivity improvement in construction projects: A systematic review,” Autom. Constr., vol. 161, 2024.

H. , X. L. , & C. P. Zhang, “Explainable artificial intelligence for infrastructure asset management: A review of opportunities and challenges,” Autom. Constr., vol. 160, 2024.

X. , L. H. , & W. G. Zhang, “Equipment logistics and productivity in infrastructure construction projects,” Autom. Constr., 2022.