Causes Of Cost Overrun In Building Construction Projects
Keywords:
causes of cost overrun, building construction projects, RII, variables, indicatorsAbstract
Cost Overrun is a persistent problem in both developed and developing countries, causing financial losses, difficulties, project delays, and possibly even project failure. The project cost overrun on 4 buildings is quite large and encourages the search for the cause of the project cost overrun, which not only includes 4 buildings but also other equivalent building projects. Through interviews and distribution of questionnaires that have previously been validated by several experts so that the questionnaire is valid. Distribution was carried out and received a return of 37 respondents. The result is that there are 20 valid indicators and the causes of cost overrun are obtained from RII calculations by placing the 8 largest ranks on 11 indicators, with the biggest causes of Cost Overrun being Lack of control and control of material quality, shortage of labor, weak logistics supervision resulting in loss of materials, inflation and escalation of material prices, high rental or purchase prices for equipment due to not conducting a survey first, Lack of construction materials, poor productivity and quality of human resources, additional work due to changes in design and drawings, work instructions that are not understood properly, by paying attention to the highest to lowest variables, the main one is material, the second highest is equipment, the third highest is labor, and the lowest rank is other variables
References
[1] L. Molinari, E. Haezendonck, ja V. Mabillard, ”Cost overruns of Belgian transport infrastructure projects?: Analyzing variations over three land transport modes and two project phases”, vsk. 134, nro January, ss. 167–179, 2023.
[2] W. Alaghbari, A. A. Al-Sakkaf, ja B. Sultan, ”Factors affecting construction labour productivity in Yemen”, Int. J. Constr. Manag., vsk. 19, nro 1, ss. 79–91, 2019, doi: 10.1080/15623599.2017.1382091.
[3] A. Rauzana, ”FACTORS CAUSING COST OVERRUNS IN CONSTRUCTION PROJECTS”, Int. J. Eng. Technol. Manag. Res., vsk. 9, ss. 1–9, 2022, doi: 10.29121/ijetmr.v9.i10.2022.1231.
[4] B. Flyvbjerg ym., ”Five things you should know about cost overrun”, Transp. Res. Part A Policy Pract., vsk. 118, nro December, ss. 174–190, 2018, doi: 10.1016/j.tra.2018.07.013.
[5] A. B. Widiaputra ja P. Arumsari, ”Analysis of the dominant factors causing cost overrun in building construction projects Analysis of the dominant factors causing cost overrun in building construction projects”, IOP Conf. Ser. Earth Environ. Sci. Pap., vsk. 794, nro 1, ss. 1–10, 2020, doi: 10.1088/1755-1315/794/1/012008.
[6] A. M. Abdelalim, M. Salem, M. Salem, ja M. Al-adwani, ”An Analysis of Factors Contributing to Cost Overruns in the Global Construction Industry”, 2025.
[7] F. Putra ja M. Waty, ”Analisis Faktor-Faktor Penyebab Cost Overrun”, vsk. 5, nro 1, ss. 15–24, 2022.
[8] V.?; Andian ja M. Waty, ”Peringkat Faktor Faktor Yang Mempengaruhi Terjadinya Cost Overrun Pada Proyek Konstruksi Pada Masa Pandemi Covid 19”, J. Mitra Tek. Sipil ( JMTS), vsk. 5, nro 3, 2022.
[9] V. Andian ja M. Waty, ”Factors Of Affecting The Occurrence Of Cost Overruns In Construction Projects During COVID-19 Pandemic”, Factors Affect. Occur. Cost Overruns Constr. Proj. Dur. COVID-19 Pandemic, vsk. 1, nro 2, ss. 685–694, 2023, doi: https://doi.org/10.24912/ijaste.v1.i2.685-694.
[10] M. M. Ghazal ja A. Hammad, ”Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects”, Int. J. Constr. Manag., vsk. 22, nro 9, ss. 1632–1646, 2022, doi: 10.1080/15623599.2020.1738205.
[11] R. M. Johnson ja R. I. I. Babu, ”Time and cost overruns in the UAE construction industry: a critical analysis”, Int. J. Constr. Manag., vsk. 20, nro 5, ss. 402–411, 2018, doi: 10.1080/15623599.2018.1484864.
[12] K. Mathew ja M. Waty, ”Analisis Cost Overruns Pada Proyek X”, JMTS J. Mitra Tek. Sipil, vsk. 7, nro 3, ss. 977–986, 2024, doi: 10.24912/jmts.v7i3.30774.
[13] A. S. Dewanto ja M. Waty, ”Analisis Penyebab Cost Overrun Berdasarkan Perbandingan Rab Dan Rap Pada Lima Proyek Gedung”, JMTS J. Mitra Tek. Sipil, vsk. 9, nro 3, ss. 823–830, 2026, doi: 10.24912/jmts.v9i3.37387.
[14] R. S.?; Bataric ja M. Waty, ”ANALISIS PENYEBAB PEMBENGKAKAN BIAYA PADA PROYEK KONSTRUKSI RUMAH TINGGAL X”, J. Mitra Tek. Sipil ( JMTS), vsk. 8, nro 3, 2025.
[15] C. Faustine ja D. M. Waty, ”Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi”, JMTS J. Mitra Tek. Sipil, vsk. 5, nro 3, ss. 681–692, 2022.
Downloads
Published
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.